Khimki Office

  • Place
    Khimki Office
  • Square
    280 sq.m.
  • Срок выполнения
    7 months
Installed systems
  • Climate control
  • Video projector in the meeting room
  • Curtain management
  • Lighting by time of day
  • Equipping the manager's office
  • TV control from iPad
  • Management scenarios for all systems
  • The control is implemented both from switches, and from iPad, iPhone.
Task

Design, installation supervision (control of the work of electricians), equipment supply, assembly of electrical panels and low-current racks, commissioning.



Result
  • A climate and lighting control system has been installed
  • A multiroom system is installed
  • Automatic curtain control is set up
  • A remote control system for iPhone has been developed and implemented
  • An individual control interface based on iRidium mobile has been drawn
  • Equipped with a meeting room
  • Equipped with a manager's office
  • Equipment manufacturers in the project
Discuss your project with a specialist
Leave a request, and our specialists will make a detailed preliminary calculation and answer all your questions!
В форме содержатся ошибки!
By clicking on the "Submit application" button, you agree with our Privacy Policy